Mutamad — معتمد

Construction documents,
built for Saudi.

Purpose-built for Saudi construction projects — from WIR to final approval, tracked, auditable, and fast.

01 · The Problem

Construction in Saudi runs on paper — or on software hosted abroad.

Site engineers re-sign documents by hand. Project managers chase signatures across floors. Foreign platforms can’t serve Arabic, can’t price for the local market, and can’t keep data in-Kingdom.

Paper-bound workflows

WIRs buried in filing cabinets. NCRs tracked on paper logs. Approvals stuck waiting on a signature three floors away. Engineers spend more time recreating lost paper than doing engineering.

Foreign software, foreign cloud

Aconex and Procore are the alternative. Enterprise pricing, hosted outside the Kingdom, no Arabic support, and built for projects nothing like the housing pipeline Vision 2030 is delivering.

No local fit

Per-seat or per-ACV pricing in USD. English-only training. Workflow templates from US/AU/UK construction. Adoption stalls at the site office.

You’d save us a lot of time and money if you can build this. Project Manager, Riyadh consultancy — one of 20 Mutamad discovery interviews

Mutamad Problem
02 / 13
02 · The Solution

We mirror the existing workflows digitally.

Mutamad replaces the paper trail with a single platform that matches how Saudi construction teams already work — contractor to consultant to client, every step tracked, every deadline enforced.

Contractor
Build
Engineers, QC, PMs prepare and submit
Consultant
Review
Discipline review, lead sign-off, PM approve
Client
Approve
Representative signs to release payment
WIR · Inspection Request NCR · Non-Conformance CPR · Concrete Pouring MT · Material Testing PQD · Pre-Qualification PRU · Progress Update PC · Payment Certificate

From WIR to final approval — tracked, auditable, and fast. README · Mutamad

Mutamad Solution
03 / 13
03 · The Product

Every document type in the Saudi construction lifecycle.

17 document types, role-based workflows, automatic numbering, SLA enforcement, A/B/C/D response codes, Arabic UI, PDF + Excel exports — running on Saudi-hosted PostgreSQL.

WIR Work Inspection Request
Contractor submits Consultant review Lead sign-off Consultant PM approves
NCR Non-Conformance Report
Consultant PM initial Contractor QC Contractor PM Consultant review Lead PM final
CPR Concrete Pouring Request
Contractor submits Every required discipline signs Consultant PM approves
PC Payment Certificate
Consultant PM certifies Client Representative signs Payment released
+ 13 more — MT, PQD, PRU, GEN, SI, RFI, MAR, SDS, MSS, DSR, VO, PUN, LTR.
17
Document types
A / B / C / D
Response codes
EN + AR
Native RTL UI
SLA
Automatic enforcement
Mutamad Product
04 / 13
04 · Why Now

Three forces just collided.

The Saudi construction sector is mid-execution on Vision 2030, the data-protection regime now regulates foreign-cloud workflows, and Arabic-first is no longer optional for site teams.

01 — Demand

Vision 2030 is delivering homes right now.

The Housing Program targets 70% Saudi homeownership by 2030. It hit 65.4% by end-2024, beating its 65% interim target. The next five years are the construction wave.2

+48,000 Saudi families moved into new homes in H1 2025 alone.2
02 — Compliance

Saudi PDPL changed the cloud calculus.

SDAIA’s Regulation on Personal Data Transfer Outside the Kingdom (Aug 2024) requires risk assessments, contractual safeguards, and in some cases SDAIA approval to send Saudi project data abroad.5

In-Kingdom hosting eliminates the transfer-impact-assessment overhead foreign SaaS now carries.
03 — Adoption

Arabic-first is non-negotiable.

Site engineers reject translated UIs. Mutamad ships native Arabic copy with full RTL, not a machine translation bolted on — every form, every notification, every PDF.

EN + AR shipped from day one, with Thmanyah for native Arabic typography.
Mutamad Why Now
05 / 13
05 · Market

A $196B construction sector, no local document platform.

We size the opportunity from the top: Saudi construction contract awards, narrowed to the software-addressable spend, narrowed again to what consultant-led GTM can realistically capture in three years.

TAM — by 2030
$408M
Saudi construction & design software
Saudi construction & design software market projected at $407.6M by 2030 at 10.1% CAGR — the addressable software layer above a $196B/yr construction sector.3,1
SAM — by 2030
≈$80M
Vision 2030 housing-supervision software
The consultant-driven housing-supervision slice of TAM — ~20% — modeled on Vision 2030 Housing Programme spend through 2030.2,3
SOM — Year 3
≈$2M
ARR via consultant pull-through
15 consultancy firms × ~5 active projects each × ~SAR 80K per project (0.1% of ~SAR 80M avg ACV). Bottom-up from the GTM motion.

Pricing example. A SAR 100M housing project = SAR 100K/year, unlimited users, all 17 doc types. Benchmarked to Procore’s 0.1–0.2% of ACV — same shape, local currency, no per-seat tax.4

≈ denotes modeled or derived figures.
Hard figures cite published sources (see references, slide 13).

Mutamad Market
06 / 13
06 · Competition

The incumbents are global. We are Saudi.

The competition isn’t another local SaaS — it’s Aconex, Procore, and paper. Each loses on the dimensions that matter for Saudi housing projects.

Native Arabic In-Kingdom hosting Per-project pricing in SAR Built for housing workflows Local support
Aconex (Oracle) enterprise quote, USD regional rep only
Procore ≈0.1–0.2% of ACV, USD4 remote
Paper / Email yes yes free slow, lossy internal admin
Mutamad

No Arabic support, data isn’t hosted locally. Requires a dedicated employee to manage. The user’s own summary of Aconex / Procore in Saudi

Why we keep winning: Procore would need 18+ months to redesign workflows for Saudi housing and stand up in-Kingdom hosting. By then the consultant channel is locked in — local fit (Arabic, PDPL, SAR) plus consultant pull-through compound into a distribution moat.

Mutamad Competition
07 / 13
07 · Validation

20 conversations. Every one runs the same paper trail.

Discovery interviews across the three roles that touch every Saudi construction document — site engineers, project managers, and the document controllers who move paper between desks all day.

20

Discovery interviews

  • Site Engineers16
  • Project Managers2
  • Document Controllers2

You’d save us a lot of time and money if you can build this. Project Manager · Riyadh consultancy

Insight: document controllers are the wedge.

They run the paper trail today and were the most emphatic in interviews. Win them and the rest of the firm follows — they’re the daily power-users of every workflow Mutamad ships.

What’s still missing — and what the program unlocks
Month 4 → First written LOI
Month 6 → First design-partner project live
Month 12 → 3 projects across 2 firms
Mutamad Validation
08 / 13
08 · Go-to-Market

Sell consultants. Onboard contractors automatically.

Win the consultants supervising Vision 2030 housing projects, and let them drag every contractor on their projects into the platform. Founder — The Garage application, GTM answer
1

Land the consultant.

Target the 15–25 consultancy firms supervising Vision 2030 housing programmes. One LOI = one paying customer. Sales motion is in-person, in Riyadh, in Arabic.

2

Run the first project live.

The consultant runs one housing project on Mutamad end-to-end — WIR through to payment certificate. All contractors on that project onboard free during go-live.

3

Expand by project, not seat.

Every new project the consultant supervises adds 3–8 contractor firms to the platform — with their engineers, QC, and PMs already trained. The consultant becomes the distribution channel.

Mutamad GTM
09 / 13
09 · Traction

Pre-revenue. MVP shipped. Workflow engine complete.

20 discovery interviews · MVP feature-complete · 0 paying customers — by design

What’s already shipped and running — the full Saudi construction document lifecycle, multi-org access, Arabic-first UI, and SLA enforcement on Saudi-hosted PostgreSQL:

17 document types end-to-end
WIR, NCR, MT, PQD, CPR, PRU, PC, GEN, SI, RFI, MAR, SDS, MSS, DSR, VO, PUN, LTR — every type a Saudi construction project needs.
Role-based, project-scoped workflows
Contractor Engineer, Consultant Engineer, Contractor / Consultant PMs, Discipline Lead, Client Representative — scoped permissions per project.
Multi-org project isolation
Three firms (client, consultant, contractor) on the same project, each seeing only what their role and firm should see. No cross-contractor leakage.
Automatic numbering & SLA enforcement
PROJ-WIR-CIVIL-0023-style IDs, per-stage deadlines, automatic overdue flags, real-time PM dashboards.
A/B/C/D response codes + full audit trail
Mandatory comment on every response, every action logged, immutable revisions — the system of record auditors expect.
PDF + Excel exports, Arabic UI, in-app notifications
System-generated PDFs with full workflow history. Excel logs filterable by discipline, code, date. Native Arabic with RTL.
Mutamad Traction
10 / 13
10 · Team

One founder. Engineering-led. Pre-incorporation, by choice.

Mutamad has been built to feature-complete MVP by a single founder, in public, on a modern stack. The Garage is the moment to incorporate and run the first paid projects.

YE
Yousif Eltayeb
Founder & Engineer
  • Based in Riyadh, Saudi Arabia
  • Education BSc Computer Science
  • Commitment Full-time on The Garage Day 1
  • Discovery 20 interviews · PMs, engineers, DCs
  • LinkedIn linkedin.com/in/yousufaltayeb

What one engineer has shipped, solo.

17 document types with multi-stage workflows, role-based permissions, multi-org project isolation, SLA enforcement, PDF/Excel exports, automatic numbering, audit trails, and a native Arabic UI — on a modern TanStack Start / Prisma 7 / Postgres 17 stack, deployable on Saudi cloud.

What the program adds to the team

Construction-industry advisor — ex-consultancy PM who’s run Vision 2030 housing projects.
SaaS / GTM advisor — B2B operator with KSA enterprise sales experience.
First hires post-LOI — Arabic onboarding lead, then a sales lead with consultancy relationships.

Mutamad Team
11 / 13
11 · The Ask

What 12 months on the program unlocks.

Year 1 is for validation, not revenue. Three design-partner projects beats any contract chased before product-market fit.

Month 02

Saudi entity incorporated.

Operating company live with CR registration, ready to sign LOIs and invoice in SAR. The program covers legal and registration runway; we sign the first paying customer the day the entity is live.

Month 06

First project running live.

One consultancy firm runs one Vision 2030 housing project end-to-end on Mutamad — WIR through payment certificate. Design-partner pricing, full feedback cycle, AI v1 in pilot.

Month 12

3 projects, 2 firms, AI shipped.

Three housing projects live across two consultancies. NCR triage + daily-report summarization in production. Year 2 expansion playbook validated by real users, not by slide.

What the program uniquely unlocks: the entity, the Saudi-cloud runway, the AI-inference budget, and direct access to the 15–25 consultancies that decide the next decade of Saudi housing. The GTM motion is the bottleneck, not the product.
Mutamad Ask
12 / 13
12 · The Vision

Every Vision 2030 housing project,
on one Saudi-hosted platform.

Mutamad is the document and workflow system Saudi construction has been waiting for — Arabic-first, in-Kingdom, and priced for the local market.

Email
contact@yousuf.computer
Web
mutamad.net
LinkedIn
linkedin.com/in/yousufaltayeb
Location
Riyadh, Saudi Arabia
References
  1. Knight Frank via Arab News — Saudi giga-project contract awards reached $196B in 2025, up 20% YoY (arabnews.com, 2025).
  2. Saudi Vision 2030 Housing Program — 65.4% homeownership end-2024 vs 70% target by 2030; 48,000+ Saudi families moved into homes in H1 2025 (vision2030.gov.sa, momah.gov.sa).
  3. Grand View Research — Saudi Arabia construction & design software market projected to reach $407.6M by 2030 at 10.1% CAGR (grandviewresearch.com).
  4. Procore pricing benchmark — annual fee approximately 0.1–0.2% of project hard costs (ACV); unlimited users (planyard.com analysis of Procore pricing).
  5. SDAIA — Regulation on Personal Data Transfer Outside the Kingdom of Saudi Arabia, Aug 2024; Risk Assessment Guideline, Feb 2025 (sdaia.gov.sa, dlapiperdataprotection.com).
  6. IMARC Group — Saudi Arabia construction market valued at $101.4B in 2025 (imarcgroup.com).
Mutamad Vision
13 / 13