A walkthrough of Mutamad for project managers — how the management view of every villa, every claim, every signature comes together without typing.

Act 1 · Setup

One project, five gates.

Before any document can flow, the project is configured once: Config · Inventory · Team · Workflow · Breakdown. The setup wizard walks the owner through each gate. Once all five turn green, the project flips from INCOMPLETE_SETUP to ACTIVE.

  • 1
    Config — project code, contract value, dates, currency.
  • 2
    Inventory — buildings & villas, the units progress is measured against.
  • 3
    Team — invite the three firms, name the project PMs, lock the discipline leads.
  • 4
    Workflow — pick which document types are enabled and who signs each stage.
  • 5
    Breakdown — bill of quantities (بنود) per contractor, with weights that drive every claim.
Owner ≠ Operator. Org owners configure and approve — they don't review, sign, or get assigned project work. Stages route to per-project PMs and discipline leads.
mutamad.sa/projects/hayy-al-lawz/admin/setup
Mutamad project setup wizard — five gates
Mutamad Act 1 · Setup
02 / 12
Act 2 · Field Work · طلب فحص

Field to desk in 30 seconds.

A Work Inspection Request — the contractor's engineer raises one when work is ready to be checked. The villa, the discipline, the activities, the photos — all in a single form. On submit, the chain freezes and the inspector's desk lights up.

  • 1
    Villa picker the unit being inspected — drives the heatmap cell that will eventually darken.
  • 2
    Discipline-filtered بنود only the activities under your discipline appear. Multi-select for a single inspection covering several items.
  • 3
    Photos with GPS EXIF metadata carries lat/long and timestamp. The evidence travels with the document — it is the document.
  • 4
    Submit freezes the chain signers, SLAs, and routing snapshot at submit time. Nobody can rewrite history downstream.
30 seconds, not 30 minutes. No re-typing the villa number, no scanning a paper request, no chasing whose desk it lives on.
mutamad.sa/projects/wadi-talah-2/documents/wir/create
New WIR creation form
Mutamad Act 2 · Field Work
03 / 12
Act 2 · The Chain · A · B · C · D

Every signature lives on the document.

Once filed, the WIR moves through its chain — contractor → consultant engineer → discipline lead → consultant PM. Each step picks one of four response codes. The chain stays visible to everyone: who has it, what they said, how long they took.

A
Approved
Work passes inspection. Activity weight registers. Heatmap darkens.
B
Approved · Note
Minor comments to address. Advances, but the note travels with the doc.
C
Rejected
Returns to the contractor with reasons. New WIR required to re-file.
D
Resubmit
Rework and re-file on the same document — the chain reopens.
  • 1
    Chain stepper shows where the doc is, who held it, and how long.
  • 2
    Evidence gallery — every photo, every revision, attached to the chain.
  • 3
    SLA timer ticks per stage. Amber = nearing breach, red = breached.
mutamad.sa/projects/wadi-talah-2/documents/wir/WIR-00431
WIR detail with chain path and evidence
Mutamad Act 2 · Chain
04 / 12
Act 3 · Progress · تقرير التقدم

One truth per discipline.

The Progress Update is how cumulative %-complete moves. The PM-side reviewer compares the previous figure, the evidence (approved WIRs since), and the new claim — line by line, villa by villa. One open PRU per contractor × discipline at a time, by design.

  • 1
    Prev → New two columns side-by-side. The PRU explains the delta.
  • 2
    Evidence column approved WIRs since the last PRU. Click through to the WIR. The audit chain is one tap deep.
  • 3
    Warn-but-allow if a claim outruns its WIR evidence, the line warns — but the PM can still approve with a reason. Friction, not blocking.
  • 4
    One open PRU rule ≤ 1 open PRU per contractor × discipline. No two streams of truth.
On approval, UnitActivityProgress materializes — the source the heatmap, the S-curve, and the مستخلص all read from.
mutamad.sa/projects/wadi-talah-2/documents/pru/PRU-00112
PRU edit with prev / evidence / new columns
Mutamad Act 3 · Progress
05 / 12
Act 3 · One Artifact, Whole Project

The heatmap is the project.

Every approved PRU darkens a cell. Every villa is a column, every activity a row. One artifact reads the whole project — overall %-complete, where work is concentrated, where it's stalled. Every cell is a link into the per-villa report.

  • 1
    5-step green ramp 0–20 / 21–40 / 41–60 / 61–80 / 81–100. Read the ramp, read the project.
  • 2
    Click any cell → per-villa report activity-by-activity drill, with the WIRs and PRUs that built each number.
  • 3
    No reports to run the heatmap is the report. It's already up to date because PRUs material­ize on approval.
For the PM upstairs: one screen, one answer. For the consultant defending progress: the link is the proof.
mutamad.sa/projects/wadi-talah-2/financials#heatmap
Financials heatmap close-up
Mutamad Act 3 · Heatmap
06 / 12
Act 4 · Payment Claim · مستخلص

The مستخلص writes itself.

The headline moment. The cover sheet — the document the client signs to release money — is computed from approved PRUs and frozen at certification. Numbers are evidence, not typed.

mutamad.sa/projects/wadi-talah-2/documents/pc/WT2-PC-RIMAL-3/cover
مستخلص cover sheet (Payment Certificate)
Per Villa Work Line
PC=(curCum%prevClaim%) × villaBudget × Σ weights
curCum% is the cumulative figure from the latest approved PRUs. prevClaim% is what the previous certified PC paid out. The delta × budget × activity weights = this villa's line on the claim.
  • 1
    Auto-computed lines per villa, per discipline. No spreadsheet, no re-typing.
  • 2
    Freeze on signature when the PM certifies, the figures lock. Future PRUs don't retroactively change a signed claim.
  • 3
    Org-scoped at three surfaces contractor sees their lines, consultant certifies, client signs. Same document, three views.
Mutamad Act 4 · مستخلص
07 / 12
Act 4 · How the Lines Build

Auto-computed work lines. Auditable material lines.

The PC builder is two tables. Work lines roll up from approved PRU progress — one line per villa. Material lines are backed by Material Tests (MT) — and if an MT is missing, the line warns before the PM can certify.

  • 1
    WORK lines computed per villa from PRU progress. You read them; you don't type them.
  • 2
    MATERIALS lines backed by approved Material Tests. Click through to the MT — the audit chain is one tap.
  • 3
    Warn-but-allow a material with no MT shows a warn chip. The contractor PM can still submit with a justification; the consultant PM sees it before certifying.
  • 4
    Certifying flips the PC to AWAITING_CLIENT_SIGN. The client representative is the final approval.
Same data, three documents. The work lines are the same numbers the heatmap colors and the S-curve plots. One source of truth.
mutamad.sa/projects/wadi-talah-2/documents/pc/WT2-PC-RIMAL-3/edit
PC builder with auto-computed work + material lines
Mutamad Act 4 · PC Build
08 / 12
Act 5 · On Your Desk

Your desk is the work.

No more "what's stuck on my plate." Every document waiting on you, every document returned to you, and every document about to land — across every project you're on, sorted by SLA.

Waiting on you
Sign or respond
Sorted by SLA — red first, amber next, green when there's time.
Returned
Rework needed
Docs you filed that came back C or D — fix and re-file.
Coming to you
Mid-chain
In someone else's hands now — but lands on yours next.
  • 1
    Pool items light up for everyone eligible until claimed. First responsive engineer takes it.
  • 2
    Cross-project — your desk pulls from every project you're a member of. One inbox.
  • 3
    SLA chips tell you the truth at a glance. on track. nearing. breached.
mutamad.sa/projects/wadi-talah-2/desk
Desk with 3 tracks + SLA chips
Mutamad Act 5 · Desk
09 / 12
Act 5 · Financials, Live

Live numbers. No reports to run.

The financials page is the dashboard. Headline figures at the top, the S-curve in the middle, the claims register and the heatmap below — all reading from the same materialized progress. Role-gated: the contractor sees their slice, the consultant sees the project total, the client sees what's settled.

  • 1
    StatBar contract value, certified to date, in-flight, paid. Headline numbers, role-scoped.
  • 2
    S-curve planned vs earned. The gap is the conversation with the client.
  • 3
    Claims register every مستخلص, draft to paid. One-click into any claim.
  • 4
    Heatmap villa × activity matrix. Cells link into the per-villa report.
What changes on this screen when a WIR is approved? A heatmap cell darkens; the S-curve nudges; the next claim line gets bigger. Live.
mutamad.sa/projects/wadi-talah-2/financials
Financials dashboard — StatBar + S-curve + register + heatmap
Mutamad Act 5 · Financials
10 / 12
Putting It Together

Two pipelines, one project.

Every document is one pipeline. The project itself is another. Both run in parallel, both produce evidence at every step. This is what "Mutamad" does in a single picture.

One Document — life of a WIR / PRU / PC
CREATE SNAPSHOT SLA TICKS ON DESK RESPOND A B C D ADVANCE or RETURN APPROVED
On approval: earns activity weight · materializes progress · freezes the next claim line. Three downstream effects, one signature.
One Project — from setup to handover
INCOMPLETE_SETUP 5 gates green ACTIVE docs flow PRUs materialize PCs settle punch lists clear DELIVERED
The project lifecycle is the union of every document's lifecycle. Setup is configured once; the rest is the work.
Mutamad Lifecycle
11 / 12
Close

You ran the site.
Now run the project.

Mutamad gives engineer-PMs the management view of the work they already know — without typing it twice.

Visibility Audit by default Money math is automatic
Mutamad Close